You don't have javascript enabled. Good luck with that.
Pencarian
Pembangunan DP Nol Rupiah Gunakan Teknologi Baru

Zero Down-Payment Housing Project in Pondok Kelapa Reaches 10 percent

The zero down-payment housing project at Jalan Haji Naman Pondok Kelapa Urban Village, Duren Sawit, East Jakarta has reached 10 percent. 

Currently the zero down-payment housing project in Pondok Kelapa has touched 10 percent or entered piles installation stage

"Currently the zero down-payment housing project in Pondok Kelapa has touched 10 percent or entered piles installation stage," expressed Yoory C Pinontoan, Director of PD Pembangunan Sarana Jaya, Wednesday (4/11).

In the project, his side uses the latest technology "table form with Aluma workmanship system". This technology can work on one floor within seven days. Various facilities and supporting infrastructures will be prepared at the location.

DPD REI Supports Zero Down Payment Program

"Thereby we're optimistic it will enter finishing stage in mid-2019," he stated.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye870 personTiyo Surya Sakti
  2. South Jakarta Tackles 38 Dengue Cases to Prevent Outbreak

    access_time02-02-2026 remove_red_eye441 personTiyo Surya Sakti
  3. TransJabodetabek Expansion, a Strategic Step to Increase Public Transportation Use

    access_time26-01-2026 remove_red_eye428 personFakhrizal Fakhri
  4. Jakarta Prepares OMC and 200 Excavators to Prevent Flood

    access_time26-01-2026 remove_red_eye372 personDessy Suciati
  5. Jakarta Showers to Make Way for Partly Cloudy Skies

    access_time30-01-2026 remove_red_eye361 personDessy Suciati
close